Frequently Asked Questions

What kind of services do you provide?

We offer a full service package, which includes:
-Professional on-site measure
-Professional kitchen design
-Product delivery & Unloading
-Professional cabinet installation
-Complete project management

How many cabinet lines do you offer?

We are Exclusive Authorized Dealers for Merit Kitchens, who have been manufacturing cabinets in the lower mainland since 1971. Merit Kitchens offers 2 cabinet lines both of which offer a pre-finished Birch plywood case.
Merit Kitchens; a Semi-Custom/Custom Line
Lectus Cabinets; a mid-range product line designed to fit any budget.

Do you do custom millwork? (Entertainment & TV Wall units, Fireplace areas, etc.)

Yes, just let us know what you have in mind.

I have a specific color I’d like for my cabinets – can you match it?

Yes, Merit Kitchens can color match. Please contact us for further information.

Do you work with Design Firms and Building/Renovation Contractors?

We work with several reputable design firms, builders and renovation contractors. We are always open to, and
welcome the opportunity to work with more!

Do you do any of the electrical or plumbing?

We cannot provide any electrical, plumbing, ventilation, appliance installation or other renovation related supplies or services, as we are not licenced to do so. It is always recommended that you hire professionals for such services.

Do you do complete renovations?

We work with a number of preferred contractors, and, depending on the scope and
size of your project, we can refer accordingly.

How much does a kitchen renovation cost in 2022?

Are you hoping to renovate your cooking area but wondering how much money it will run you? It’s never an easy answer because each room is unique and each person’s vision is different. Cabinets can come in a wide range of prices, for instance. Then there’s the price of labor, if you elect to use professional help.

It’s a lot to wade through. On this page, we’ll help you estimate your kitchen renovation cost and determine the best course of action for your remodel.

What Does an Average Kitchen Renovation Cost?

Knowing the average kitchen renovation cost can help put your unique prices into context. Of course, the average price can be somewhat tricky to determine because of fluctuating prices, especially in the current era when there are still so many unforeseeable economic hiccups.

Still, a good starting point for the price tag to remodel a kitchen in Canada is $100 to $325 per square foot, coming to about $20,000 to $100,000 in total cost. That may seem like a high number for a seemingly simple job, but remodeling often requires a lot more work than simply switching our cabinets.

Plumbing and electrical work is often needed once surface renovations begin. So, when asking “how much does it cost to renovate a kitchen,” remember there’s often a great deal more involved than changing aesthetic items.

Cost of Kitchen Design

Kitchen design is one of the most widely ranging of all the remodeling prices. Typically, though, help with a new design will run you about 4 percent of the total price tag, which is on average about $1,200.

This price is going to be different for a small kitchen or a medium sized or a larger one, so check with service providers before making any assumptions. In certain cases, cooking area design may be significantly less pricey or more than the average.

 

Installation

Remodeling work is highly skilled labor and comes with a price tag. It generally accounts for the biggest part of the average price to renovate a kitchen.

On average, it will run about 17 percent of the total price of the work, which is generally around $5,102.

This is not an area to prioritize minor savings over quality. Poor installation can make the best products look subpar, just as good installation can make lesser quality products look great. Going with professional service by a top-rate provider like Final Draft Cabinetry can be the deciding factor in the success of your kitchen renovation.

Cabinets, Cabinet Installation, and Hardware Cost

Cabinetry and cabinet installation often account for the greatest price in a remodel. The products themselves run some money, but so too does the labor. Cabinet installation is an art unto itself. Doing it isn’t easy. Doing it well is even harder. Like any good professional expertise, it takes money.

The average price for the cabinetry and the hardware associated with the cabinetry should account for about 29 percent of the total renovation price.

The price of this will be much less if you’re refacing cabinets rather than replacing them.

Cost of Kitchen Countertops

Countertops come in a wide range of designs and materials. Typically, they will account for 10 percent of the total price of your remodel job. That’s about $3,001.

Some people will opt to add tile backsplash to the wall behind their countertops. Others will not. It’s an optional additional cost to consider.

Kitchen Renovation Lighting Costs

Many remodel jobs will not require new lighting at all. When it is required, though, it runs about 5 percent of total cost, or $1,500.

This is one area that’s good to discuss with a designer. While it might not seem like an obvious or intuitive addition to your kitchen remodel vision, it can make a drastic difference to the final product. Talk it over with an expert before deciding one way or the other.

Lighting fixtures can be highly variable in cost. Going with a simple option will be quite different from a fancy one.

Flooring Costs in Kitchen Renovation

Floors generally run 7 percent of total renovation price. That comes to $2,100.

Even if you don’t want to replace your floors, you may find that you have to. Some of the other work that comes with remodels will necessitate flooring work. Bring this up in the design process to get an idea ahead of time whether or not you’ll need this work.

Costs of Appliances and Ventilation

Appliances and ventilation typically run 14 percent of the total remodel price tag, which is $4,201. Of course, your particular renovation might not include any new appliances at all.

Kitchen Renovation Door and Window Costs

A full-scale cooking area renovation is going to include new doors and windows. They will run on average 4 percent of the remodeling kitchen cost (about $1,200).

That cost is relatively minor when you consider what a difference it can make. New windows can really change how you see the world—literally!

Cost of Kitchen Walls and Ceilings

Work on your walls and ceiling will account for about 5 percent of your total renovation cost. That comes to about $1,500.

Even if you’re not looking to make major alterations to these areas, some work is almost guaranteed to be needed in a full remodeling. Changes to light fixtures, cabinets, and other such items will often necessitate work to walls and ceilings.

Faucets and Plumbing Costs

The cost of new faucets and associated plumbing are going to run you about 4 percent of the cost of your total project cost. There are some cases (such as extremely old piping) that might run significantly more money, so be sure to get a good look underneath your house’s hood at the design phase. Doing so will eliminate any unwelcome surprises.

Putting it All Together

So, “How much does a kitchen renovation cost?” As you can see, the answer to that is highly variable.

Still, knowing the average prices can give you a good contextual starting point. If you want help sifting through the details, contact us at Final Draft Cabinetry. We can help you with everything from design to cabinet and countertop installation. They also keep a list of highly regarded contractors that they can set you up with for any other labor required.

Final Draft Cabinetry will work with you to see your cooking area remodeling through from start to finish. Contact us today for a no-obligation consultation.

Do you reface cabinets?

This is not a service that we offer.

Can you supply doors only for my existing cabinets?

We only supply full cabinet cases with doors.

How long before I get my cabinets?

Your cabinets are actually ‘made to order’ specifically for your project. Upon ordering your cabinets, lead times are generally between 6-8 weeks.

Do you tear out old cabinets?

Generally this is not a service we offer but we have made exceptions for smaller kitchens or vanities. Usually, it is the contractor or homeowner who would tear out the cabinets. We have had several clients sell their cabinets or even donate them.

Can I install my cabinets or have someone else install them?

In order for your warranty from Merit Kitchens Ltd. to be valid, one of our Installers must install your cabinets. As well, we would have to charge 7% PST to your bill if you or someone else were to install them.

How long does it take to install a kitchen?

An average 12’ x 12’ kitchen consists of roughly 20 cabinet cases. A kitchen with this many cases will take 3-4 days to install. Depending on the size of your project and complexity, install can range from 1 day to 4 weeks.

Do you install the countertops?

We have aligned ourselves with reputable countertop fabricators who have a professional team who template, deliver and install your countertops. If you purchase your countertops through us, we will arrange the template and install date for you.

When do my countertops get installed?

Once we know when your cabinets will be delivered, we request a template date as close to the beginning of the install as possible. We have our installers install the base cabinets first, as we try to shorten the turn around time for countertop install as much as possible. Similar to your cabinets, both laminate & stone countertops, are made specifically to fit in your space. With the countertop fabricators that we work with, laminate can take up to 10 days, and stone can take between 2-3 weeks before they get installed, barring no unforeseen circumstances.

Should I have my flooring installed before cabinets or cabinets before flooring?

Depending on whom you ask, you may be given different answers, but we can work either way. In our opinion, placing cabinets on top of flooring can be more advantageous. For example, should down the road you wish to change the layout of your kitchen, you are not bound to the footprint of what you had or left scrambling to find extra flooring to match what you have. Cost wise, you might be paying a bit more for material to cover the entire floor, on the other hand, placing the floor down after the cabinets are installed might increase labour costs as more time would be spent cutting the flooring to fit around the cabinets. As well, timelines would lengthen as we would be coming back to install the toe kick. We do request that you protect your flooring with a product called Ramboard, which should be installed 24” from the walls that cabinets will be installed against. We recommend using blue masking/painters tape to adhere.

When should I have my appliances delivered?

Appliances should be available on site when your cabinets are delivered. It is best that they are stored out of the kitchen, as long as our installers can get access to them for cross-referencing measurements. It is also imperative that you have all of your sinks and faucets readily available for the countertop template. Not having your sinks on site will delay the turn around time for countertop installation.

How long does a kitchen renovation take?

How long does a kitchen renovation take? Well, it depends on a whole lot of factors.

The factors include those things that are unique to your home as well as those things that are happening in the macroeconomic environment at the time of your remodel. This has always been true, but it’s even more so in the current era when there are so many issues with supply chains and labor.

So, we’ve put together this page to give you a good idea about the starting point for your project.

Kitchen Renovation

What is the Scale of the Renovation?

The time it takes to renovate your kitchen will depend largely upon the scale of the work. That scale involves not only the size of your room but also the depth of the work. Switching our countertops, for instance, will be significantly different from rebuilding the entire room from the floor up.

Here are a few good guidelines:

  • The average remodel will run about 6 to 8 weeks.
  • Total remodels, meaning wall-to-wall kitchen renovation, will be more like 3 to 5 months. (Note that that says “months,” not “weeks”).
  • Large rooms can take 10 to 12 weeks.
  • How long does a small kitchen renovation take? Well, that can possibly be as little as 2 to 4 weeks, but remember that the size of the room is only one factor. The degree of remodel and the quality of the materials you use make a big difference, as well.

How Long Kitchen

What is a Kitchen Renovation Process Timeline Like?

When you’re looking at how long to do a kitchen remodel, you probably ask why so much time is needed. The remodel process is actually quite complicated. The full kitchen remodel steps are:

  1. Planning and design: This part usually starts with the customer’s rough idea and a designer’s expert input. This one can be widely variable and based largely on the customers’ own timeline. Your degree of decisiveness and clarity will influence how long this takes more than any other step in this list.
  2. Demolition of old room: Before you can build a new kitchen, you’ll need to clear out the old. The degree of demolition will depend on the degree of remodeling. That which isn’t going to be replaced won’t need to be torn down.
  3. Installation of new pipes and wiring: New items such as faucets, countertops, and light fixtures will require the installation of plumbing and electrical wiring.
  4. Inspection: Health and safety inspectors will need to review the plumbing and wiring.
  5. Finishing of walls: After the room clears inspections, the walls can be refinished, sealing the new plumbing and wiring away and making room for the cosmetic changes.
  6. Installation of doors and windows: Many remodels forego doors and windows, but if they are part of your job, the work will be done at this phase.
  7. Installation of new flooring: Even if you weren’t looking for new flooring in your initial vision for redesign, you may need to replace it to accommodate your other changes.
  8. Putting in faucets, fixtures, and cabinets: This is the pretty stuff that people usually started their remodel for.
  9. Appliance installation: If you’re putting in new appliances, it will be done at this stage. Or, if you’re keeping your old ones, they’ll be reinstalled at this point.

So, as you can see, there is a lot of work involved in remodeling a kitchen. The time spent is not time wasted!

Can You Make a Kitchen Renovation Go Faster if You do the Work Yourself?

When people see the average timeframe for a kitchen remodel, they often wonder if they can do it faster themselves. They may indeed be able to do so, but not without paying a serious price in quality and possibly also cost.

Unless you’re a construction professional, a full remodel is almost certainly too complicated to take on yourself. Much of the work is hazardous, even. You don’t want to be doing electrical work yourself if you’re not trained to. Plus, to do the work legally, you need to make sure it passes health and safety inspection. That’s work best left to a professional.

Doing the work yourself may even end up taking longer than a professional, anyway—possible much longer. Each of the full remodel steps are necessary, and a single mistake among the many can unleash a tsunami of corrections.

How Can You Expedite Your Kitchen Renovation?

The key to expediting your renovation is developing a clear design and work schedule on the front end. Get very clear on what you want and who you will be working with. Any changes partway through the process can seriously extend the renovation time. Know exactly what you want and then stick to the plan.

This is where a company like Final Draft Cabinetry can help a lot. We’re a family-owned business serving the Vancouver area. We can help with every stage of your renovation, including the all-important initial design and planning.

Our owner-operator, Daniela Sodero-Felty, is a Certified Interior Designer who will help you finalize your vision with expert input. From there, we will help you choose the right renovation products and will perform the best installation in the business. There’s no need to worry about missing a measurement when you work with Final Draft.

Ready to Get Your Kitchen Renovation Started?

As you can see, asking how long it takes to renovate a cooking area is highly variable. It can be basically the same as asking, “How long does it take to build a kitchen?”

The sooner you get started, the faster you can see your dream cooking area come to life. Contact us at Final Draft Cabinetry today to get the ball rolling on your new renovations. Whether it takes 2 weeks or 12 for your particular kitchen, you’ll be glad you got the work done in the end.

What makes us different?

FInal Draft is a mid-size company that knows the importance of personal interaction and quality control. Not only are you getting quality cabinets & countertops, you are getting peace of mind knowing our established team of professionals will be there with you throughout the processes of design, measuring, project management, delivery, and installation. Please see our main highlights below:

Eco-Friendly

100% environmentally-responsible cabinetry

Custom Kitchen Design

Design services as a part of Free quote

Fair Pricing

High quality cabinetry at Exceptional value

Life Time Warranty

Customer protection with our Limited Lifetime Warranty

Locally Manufactured

BC locally made by skilled craftspeople

Fully Insured & Certified

Full coverage with WorkSafeBC

Thinking of remodeling your kitchen?

Request a Free no-obligation Quote with a Free Kitchen Design Included

604-293-1020